.

Monday, April 8, 2019

Setting Up a Network at a New Office Essay Example for Free

backcloth Up a Network at a New Office Essay1.1 frequent backcloth up a new interlock at a new office will lease the purchase of new workstations, inst eaching a new server, or implementing interlocking security and virus auspices corpses internet wide. LC Comm primary goal is to translate the technology needs of your building into an industry standard resultant that produces clear, tangible results for the business. It is also my goal to educate and help you understand some of the more technical aspects of your network upgrade by putting it into a simple, easy to comprehend. Network provision and network upgrades performed will hail the accepted best practices of successful installations.This process and my exclusive 100+ point pop checklist ensures consistent results with naught or minimal disruption to your office during the course of the network planning, network upgrade, server installation or new computer installation. Since I place my highest values on consis tent, reliable solutions for the long-term happiness and productiveness of your office, you can feel confident I will only recommend proven network planning and network upgrades that will accomplish these goals and not those that are the coolest or newest at the time. An IT project is an endeavor with a definitive timeline (start date and end date) during which specific goals and objectives are met. Projects occur in addition to the regular alimentation of your network and technology equipment, and often emerge as a result of issues discovered during regular maintenance.1.2 General Scope of WorkLC Comm. proposes to produce contract specifications and look drawings for all building spaces as well as the communications cabling formation. This will include the plan views of all equipment rooms, labs, MDF/IDFs and the facelift views of equipment racks and cabinets. In general, this includes the following 1.2.1Participation in the determination process. LC Comm will work with the Cu stomer to validate space requirements and produce electrical and mechanical program requirements for all computer room and telecommunications facilities and equipment. This includes CAD plan drawings of computer room and telecommunications room equipment. It also includes CAD elevation drawings of the network and server cabinets. As a participant in the radiation diagram team, these requirements and drawings will beconveyed to the architects and engineers for cellular inclusion into the schematic drawings, the design development drawings and finalized in the building documents.1.2.2 Assist Customer in designing the local anesthetic and wide-area networking requirements. This includes any high-speed lines that will be necessitate in the new main site and early(a) locations. Full back up and redundancy is assumed.1.2.3 Assist Customer in placing all computer and network equipment on the drawings. 1.2.4Production of the building communications cabling systems requirements as may be required. These include the data structured cabling system for the building, bus tag cable design should a large mainframe be involved and inter-cabinet cabling systems surrounded by the network and server cabinets. 2.0Specific Scope of Work2.1Schematic Design2.1.1Validate all space requirements for the technical areas associated with the data concentrate complex. This includes but is not limited to the following Computer equipment areaOperations console area track record farm and tape robotsNetwork areaServer areaPrinter and paper storage areas stage areasEnvironmental systems on or under the raised floor area Technical support areas orthogonal of the raised floor areaMeeting roomsStorage spaces2.1.2 enrol in the design and data gathering process to determine, produce or participate in the followingRough draft of computer and network equipment layoutsDiscussion of adjacency requirements for the data heart operating areasParticipate in discussions to determine facility design requirementsParticipate in meetings to determine what computer and network equipment will be acquired for the new data centerDevelopment of preliminary high-level project schedule with milestones. data gathering for communications and network cabling requirementsData gathering ofenvironmental requirements for computer and network equipment that will be in the raised floor and telecommunications facilities. (Power and cool down Profile)Gather requirements for telecom grounding requirementsIdentify MDF and cable entrance areasIdentify type and cable provider vaults on or near propertyBegin early draft of communications cabling specificationParticipate in discussions on redundancy of environmental systems and the elimination of any single point-of-failureParticipate in discussions on disaster recovery and business resumption2.1.3 Participate in discussions to identify design requirements for the telecom fictional character and copper entrance cables.2.1.4 Participate in scheduled and ad hoc meetings as may be required to produce required deliverables. Meet with vendors as may be required. 2.1.5 document technical meetings and discussions. reproduce and deal documentation.2.2 Design Development2.2.1 Finalize plan view of equipment layouts for MIS, IT, network, server, telecommunications and PBX systems2.2.2 Finalize detailed environmental requirements for all MIS, IT, network, server, telecommunications and PBX systems2.2.3 prepare final draft of the communications and network cabling specifications. This includes and custom specifications for cable runway, network cabinets, under floor fiber cable tray systems2.2.4 Produce final draft of telecom grounding requirements2.2.5 Produce final draft of project schedule with milestones 2.2.6Produce draft of network and server cabinet elevation drawings2.2.7 Produce draft electrical board breaker assignments for Electrical Engineer2.2.8 Participate in scheduled and ad hoc meetings as may be required to produce r equired deliverables. Meet with vendors as may be required.2.2.9 Document technical meetings and discussions. Reproduce and distribute documentation2.3 Construction Documents2.3.1Finalize all construction specifications for the followingStructured communications cabling system. Includes RFQTelecommunications entrance facilitiesInter-connecting cabling system for the network and server cabinets channel runway for PBX (MDF) and IDF areasUnder floor cable tray for fiber cables2.3.2 Finalize construction drawings for the followingStructured communications cabling system. Includes elevations telecom racks in the MDF and IDF areas. Includes instructions for seismic bracing Telecommunications entrance facilities. Includes fiber mux areasInter-connecting cabling system for the network and server cabinets. Includes elevation drawings showing connecting hardware and equipment in the network and server cabinetsCable runway for PBX (MDF) and IDF areasUnder floor cable tray for fiber cables2.3.3 Participate in scheduled and ad hoc meetings as may be required to produce required deliverables. Meet with vendors as may be required.2.3.4 Document technical meetings and discussions. Reproduce and distribute documentation.2.4 Bidding and Negotiation2.4.1 Attend bid conferences and walkthroughs as may be required.2.4.2 Respond to RFIs as may be necessary2.4.3 Produce specification or drawing modifications as may be required2.5 Construction Administration2.5.1 Walk job site periodically. Observe and gab on construction of equipment and network facilities. Produce documentation where required 2.5.2 Participate in architectural and construction project meetings where required

No comments:

Post a Comment